Phase 1 of the Proposed Development was consented in February 2025 and comprises the construction and operation of a 9.8MW Battery Energy Storage System (BESS).

Phases 2 and 3 are currently in development, with the submission of two major planning applications to South Lanarkshire Council expected in early 2026. Both of these phases comprise the construction and operation of BESS, with planning applications expected for a 49.9MW scheme and 25MW scheme. 

Location: South Lanarkshire

The Proposed Development is ideally located to maximise the benefit of nearby renewable energy generation projects, including our Priestgill Wind Farm project . Both the Proposed Development and Priestgill Wind Farm will share existing and proposed infrastructure, with both connecting via a kiosk to the recently extended Elvanfoot Substation.

June 2025

Environmental and technical assessments underway to help inform the design process

June-Aug 2025

Proposal of Application Notice submitted to SLC for two planning applications – Phase 2 and Phase 3

Aug/Sept 2025

Community Engagement Events to introduce the Proposed Developments and address feedback

Jan 2026

Submission of two planning applications to SLC

Jan/Feb 2026

Planning application consultation process ongoing

from Feb 2026

Planning application determination process ongoing

The Elvanfoot team hosted community consultation events on 21st August and 10th September 2025 at Crawford Village Hall. The information shared at these events can be viewed below: 

We welcome your views on the Elvanfoot Energy Storage project. Please complete the feedback form below or access via the QR code

https://forms.office.com/e/8kHTuUQ7YA

QRCode for Elvanfoot Energy Storage (Phases 2 3) Engagement Event Questionnaire Feedback Form

Get in touch

For any queries relating to proposed Elvanfoot development, please do not hesitate to get in touch with Calum.

Calum Mollison

Project Manager

Get in touch
Calum Mollison